Navigo3 at Amberg Engineering

Jaroslav Kuboš Case studies

The client’s requirement was a quick and smooth introduction of Navigo into normal operation. Employees appreciate Navigo’s intuitive and graphical workflow.

Navigo3 project-based ERP – Consulting companies

Problems solved


  1. only intuitive planning of employee workload
  2. lack of tools for accurate project planning
  3. Lack of interconnection of systems (contacts, projects, finances)
  4. project work in progress – who can we invoice?
  5. Lack of a reporting tool for the parent company

What the deployment of Navigo3 has brought


  1. greater efficiency through staff planning and reporting
  2. financial plans for projects and monitoring of deadlines
  3. quick access to necessary information – about projects, about the company
  4. linking contacts, projects, plans, reporting and reports in one place, accessible from anywhere
  5. customized reports

Navigo3 deployment process at Amberg Engineering

Employees and management were aware of the absence of a sophisticated information system and suspected that everything would be faster and smoother with it. Therefore, the management made very quick decisions. Within 14 days, Navigo3 was introduced, tested, launched and all users were trained. With this decisive step, the management brought clear order and set up processes not only on projects, but also on working with contacts, reporting hours worked and subsequent reporting. However, thanks to the pay-as-you-go model for Navigo, there was no need to invest in licenses and implementation.

About Amberg Engineering Slovakia

Amberg Engineering Slovakia (a member of the Amberg Group) provides design and engineering services in the areas of underground structures, geotechnics, transport structures, civil engineering and water management structures. The company provides comprehensive services, from the conception of technical solutions through the individual stages of project documentation to construction supervision.

Date of incorporation: 2003
Number of employees: 70
Annual turnover: approx. 4.5 million EUR


“The introduction of Navigo3 was really lightning fast. Thanks to this, we were able to immediately implement the planned organizational changes in the company and obtained the necessary tools for their implementation and subsequent control. Navigo3 started working immediately, but without any initial investment. Unexpectedly, we quickly had a tool in hand that increased our efficiency while not affecting our cash flow. It is a very intuitive system with high added value.”

Ing. Ivan Brigant, Director of the Project Department

Most popular

New versions

Screenshots

Jaroslav Kuboš New versions

How did the project plan evolve over time? Did the projectionist change the assignment you gave him? Someone accidentally changed the project and you don’t know how it was originally set up? All this and more will be revealed in the slides!

Read more ›
Methodology

Planning for milestones and future revenue

Jaroslav Kuboš Methodology

A milestone is a point in the project timeline. It helps to keep track of the sub-contractual obligations in the contract, but also to set internal goals to be met in the project implementation. Let’s take a look at how to schedule milestones, edit them, anchor them in time or use them without a specific date and determine future income.

Read more ›